Project Name Project Type Project Location Est. Project Cost 2010-2014 Budget Construction/Purchase Start Project Details
Legacy Park - Bearspaw HaskayneCommunity DevelopmentNW Calgary$6,270,000 $14,705,000   Details
Legacy Park - Ralph KleinCommunity DevelopmentSE Calgary$32,000,000 $14,705,000 Winter 2007 Details
Clearwater ParkCommunity DevelopmentNorth side of Highway 8 west of 69 street SW$14,705,000 $14,705,000 TBD subject to future funding approval Details
Memorial Drive Plaza Redevelopment - Phase 2Community DevelopmentSunnyside$9,000,000 $14,613,000 Summer 2009 Details
Memorial Drive- Median, Boulevard and LandscapingCommunity DevelopmentSunnyside$7,000,000 $14,613,000 Summer 2008 Details
Nose Hill ParkCommunity DevelopmentNosehill Park$10,000,000 $14,613,000 Spring 2009 Details
Major Parks-LifecycleCommunity Development205 8 Av SE$298,000 $298,000   Details
New Parks Land AcquisitionCommunity DevelopmentShepard, Bearspaw, Cougar Ridge Adjacent top of ridge west of COP$4,303,000 $4,303,000   Details
CP / CPRIIPS - NewCommunity DevelopmentVarious Locations$563,000 $563,000   Details
CP / CPRIIPS - LifecycleCommunity DevelopmentVarious Locations$376,000 $376,000   Details
Other Park Projects-Upgrade/RetrofitCommunity DevelopmentVarious Locations$415,000 $415,000   Details
Other Park Projects-LifecycleCommunity DevelopmentVarious Locations$183,000 $183,000   Details
New Parks PathwaysCommunity DevelopmentVarious Locations$6,817,000 $1,658,000   Details
Parks Pathway Lifecycle MaintenanceCommunity DevelopmentVarious Locations$9,335,000 $4,852,000   Details
Golf Courses – Lifecycle MaintenanceCommunity Development800 MacLeod Trail SE$2,775,000 $2,571,000 Ongoing Details
Capital Conservation GrantsCommunity DevelopmentVarious Locations$8,033,000 $5,067,000 Ongoing Details
Soccer Centre - Artificial TurfCommunity Development7000 48 St SE$8,300,000 $4,500,000 Pending Details
Arenas - NewCommunity Development800 MacLeod Trail SE$300,000 $300,000   Details
Arenas - Upgrade/RetrofitCommunity Development800 MacLeod Trail SE$22,000 $22,000   Details
Arenas – LifecycleCommunity Development800 MacLeod Trail SE$46,000 $1,000 Ongoing Details
Athletic Parks – LifecycleCommunity Development800 MacLeod Trail SE$4,000,000 $3,616,000 Ongoing Details
New Brighton Athletic ParkCommunity Development130 Av SE and 52nd St SE$14,600,000 $14,551,000 Spring 2012 Details
Foothills Athletic ParkCommunity Development2424 University Dr NW$2,000,000 $35,000,000 Fall 2010 Details
Shouldice Athletic ParkCommunity Development1515 Home Rd NW$3,000,000 $15,143,000 Summer 2009 Details
Foothills/ Glenmore Athletic Parks Concept plansCommunity Development $500,000 $500,000   Details
Pumphouse TheatreCommunity Development2140 Pumphouse Av SW$1,300,000 $38,000 Pending Details
Sailing School - Upgrade/RetrofitCommunity Development8415 24 St SW$422,000 $422,000   Details
Southland Leisure Centre - UpgradeCommunity Development2000 Southland Dr SW$3,871,000 $3,871,000   Details
Genesis Wellness Centre (formerly NECC)Community Development7556 Falconridge Bl NE$112,000,000 $70,647,000 Fall 2009 Details
Regional Need & Preference StudiesCommunity Development800 MacLeod Trail SE$7,030,000 $5,763,000 2008 Details
Westside Recreation Centre UpgradesCommunity Development2000 69 St SW$31,000,000 $1,522,000 Fall 2008 Details
Centennial Arena ExpansionCommunity Development2390 47 Av SW$17,000,000 $686,000 Fall 2009 Details
Peppard Arena/Glen Ap Site UpgradeCommunity Development5300 19 St SW$143,000 $121,000 complete Details
Canada Olympic Development Association (CODA)Community Development88 Canada Olympic Rd SW$28,000,000 $200,000 Fall 2008 Details
South Fish Creek Recreation AssociationCommunity Development333 Shawville Bl SE$21,300,000 $11,276,000 Fall 2010 Details
Clean To The Core' Response FacilityCommunity Safety1807 MACLEOD TR SE$1,000,000 $534,000 Q3 - 2010 Details
Equipment LifecycleCommunity Safety2201 Portland Street SE$348,000 $348,000 On-Going Details
Calgary Emergency Operations CentreCommunity Safety800 MacLeod Tr S$36,830,000 $21,678,000 Winter 2008 Details
Tuscany Temporary Emergency Response House And LandCommunity SafetyTuscany$4,820,000 $4,820,000 Fall 2012 Details
Bridlewood Emergency Response StationCommunity Safety2511 Eversyde Av SW$15,800,000 $15,800,000 Spring 2012 Details
Symons Valley Emergency Response StationCommunity SafetySymons Valley$16,124,000 $13,297,000 Spring 2011 Details
Douglas Glen Emergency Response StationCommunity Safety4199 114 Av SE$15,800,000 $15,417,000 Spring 2011 Details
Seton Emergency Response StationCommunity SafetySeton$19,200,000 $19,139,000 Fall 2011 Details
Emergency Response Houses and LandCommunity SafetyVarious$6,000,000 $5,832,000 2010 Details
N.E. Emergency Response StationCommunity Safety123 44 St SE$11,000,000 $11,000,000 Fall 2014 Details
Fire Station #5 Replacement/RebuildCommunity Safety3129 14 St SW$15,250,000 $14,920,000 Summer 2011 Details
Fire Station #11 Replacement/RebuildCommunity Safety5536 4 St SW$17,250,000 $17,250,000 Spring 2012 Details
Facility RehabilitationCommunity SafetyVarious Locations$13,214,000 $0 2013 Details
Emergency Generator / Off Grid SustainmentCommunity SafetyVarious Locations$6,800,000 $5,739,000 2011 Details
Facility RehabilitationCommunity SafetyVarious Locations$13,214,000 $13,214,000 Q3 2011 Details
Lifecycle Maintenance - FacilityCommunity Safety450 1st St. S.E. $8,894,000 $8,894,000   Details
Mobile Computing Network InfrastructureCommunity SafetyVarious Locations$0 $0   Details
FIS - Fire Information SystemCommunity SafetyVarious Locations$0 $0   Details
Communication LifecycleCommunity SafetyVarious Locations$451,000 $451,000   Details
Fire Traffic ControlCommunity SafetyVarious Locations$1,111,000 $1,111,000   Details
Tri-Services Smart Zone Radio SystemCommunity SafetyVarious Locations$5,055,000 $5,055,000   Details
Urban Search Rescue EquipCommunity SafetyVarious Locations$607,000 $607,000   Details
Communications EquipmentCommunity SafetyVarious Locations$992,000 $992,000   Details
Audible Signals/Physical Infrastructure (Council Priority)Community SafetyVarious Locations$11,000 $11,000   Details
Personal Protective EquipmentCommunity SafetyVarious Locations$1,982,000 $1,982,000   Details
Hazardous Materials Equipment/CBRMCommunity SafetyVarious Locations$1,497,000 $1,497,000   Details
Replacement - Support VehiclesCommunity SafetyVarious Locations$1,819,000 $1,819,000   Details
Replacement EmergenciesCommunity SafetyVarious$43,615,000 $33,523,000 2009 Details
Replacement Fire Fighting EquipCommunity SafetyVarious$1,201,000 $1,201,000   Details
Computerized Telephone IntegrationCommunity Safety800 MacLeod Tr S$99,000 $73,000   Details
Audio Visual SystemCommunity Safety800 MacLeod Tr S$200,000 $200,000   Details
Training / Major Events FacilityCommunity Safety800 MacLeod Tr S$248,000 $242,000   Details
Equipment LifecycleCommunity Safety800 MacLeod Tr S$120,000 $85,000   Details
Technical & Telephone Upgrades 800 MacLeod Tr S$2,800,000 $2,800,000   Details
Protective Services Deployment Management PlanCommunity Safety800 MacLeod Tr S$1,100,000 $1,100,000   Details
Public Safety Communication Telecommunication Systems UpgradeCommunity Safety800 MacLeod Tr S$3,901,000 $3,468,000 Spring 2009 Details
Emergency Services Quality Assurance ProgramCommunity Safety800 MacLeod Trail SE$800,000 $800,000   Details
Central Communication Hardware ReplacementCommunity Safety800 MacLeod Trail SE$2,750,000 $2,750,000   Details
Land Acquisition - Other Depts.Municipal Sustainability & Affordable HousingVarious Locations$64,769,000 $64,769,000   Details
WEST VILLAGEMunicipal Sustainability & Affordable HousingWEST VILLAGE$36,974,000 $36,974,000   Details
Heritage PropertiesMunicipal Sustainability & Affordable HousingVarious Locations$241,000 $241,000   Details
General Land ServicingMunicipal Sustainability & Affordable HousingVarious Locations$318,000 $318,000   Details
Long Term LeasesMunicipal Sustainability & Affordable HousingVarious Locations$351,000 $351,000   Details
Space Renovations (Manchester/Spring.Garden/Downtown)Municipal Sustainability & Affordable HousingVarious Locations$7,627,000 $7,627,000   Details
Bearspaw Operation Workplace DevelopmentMunicipal Sustainability & Affordable HousingBearspaw Dam Road$2,116,000 $130,000   Details
Facility Infrastructure Investment Program (Municipal Building)Municipal Sustainability & Affordable Housing800 MacLeod Tr S$11,632,000 $7,398,000 Summer 2007 Details
Depot Space RenovationsMunicipal Sustainability & Affordable Housing800 MACLEOD TR SE$57,000 $57,000   Details
Downtown Core - Fitness FacilityMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$1,696,000 $0   Details
Public Building Heritage RenovationsMunicipal Sustainability & Affordable Housing205 8 Av SE$30,835,000 $1,244,000 Summer 2009 Details
Optimization & Upgrade Of Municipal BldgMunicipal Sustainability & Affordable Housing800 MACLEOD TR SE$1,856,000 $1,856,000   Details
Administration Building - PurchaseMunicipal Sustainability & Affordable Housing133 6 Av SE$50,000,000 $14,059,000 Spring 2009 Details
Municipal Plaza RedevelopmentMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$2,380,000 $2,307,000   Details
DBA Municipal BuildingMunicipal Sustainability & Affordable Housing800 MACLEOD TR SE$365,000 $365,000   Details
DBA Depot DevelopmentMunicipal Sustainability & Affordable Housing800 MACLEOD TR SE$1,016,000 $1,016,000   Details
Whitehorn Roof/HVAC/ElectricalMunicipal Sustainability & Affordable Housing3705 35 St NE$8,363,000 $8,363,000 2010 Q3 Details
EMS #3 Station (Transferred from EMS)Municipal Sustainability & Affordable Housing800 MacLeod Tr S$153,000 $153,000   Details
DBA 5th Floor RenovationsMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$687,000 $687,000   Details
Furniture and Office Equip (WCB)Municipal Sustainability & Affordable Housing800 MACLEOD TR SE$3,631,000 $3,631,000   Details
Ergonomic FurnitureMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$5,938,000 $1,125,000 2008 Details
Strategy Development & Pre-Project Planning (Studies)Municipal Sustainability & Affordable Housing800 MacLeod Tr S$2,524,000 $2,524,000 2010 Details
Major Operations Work Centre - BearspawMunicipal Sustainability & Affordable Housing10010 Bearspaw Dam Rd NW$11,705,000 $11,705,000 Pending (Spring 2010) Details
Satellite Operations Work Centre - Richmond GreenMunicipal Sustainability & Affordable HousingCFB Currie$5,722,000 $5,722,000 Pendng (Spring 2010) Details
Satellite Operations Work Centre - Saddle RidgeMunicipal Sustainability & Affordable Housing7400 40 St SE$2,800,000 $9,204,000 Pending (Fall 2010) Details
Major Operations Work Centre - SarceeMunicipal Sustainability & Affordable Housing5851 Richmond Rd SW$15,826,000 $15,827,000 Pending (Fall 2010) Details
Major Operations Work Centre - ShepardMunicipal Sustainability & Affordable Housing6727 114 Av SE$17,444,000 $17,444,000 Pending (Spring 2009) Details
MAJOR OWC - SOUTH MACLEODMunicipal Sustainability & Affordable Housing $0 $0   Details
MAJOR OWC - STONEYMunicipal Sustainability & Affordable Housing $0 $0   Details
Building / Equipment ImprovementsMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$7,589,000 $4,157,000   Details
Glenbow MuseumMunicipal Sustainability & Affordable Housing130 9 St SE$2,300,000 $2,300,000   Details
Urgent & Priority RepairsMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$50,000,000 $38,117,000 Q4 2009 Details
Whitehorn RoofMunicipal Sustainability & Affordable Housing3705 35 St NE$14,184,000 $0   Details
Energy PerformanceMunicipal Sustainability & Affordable Housing800 MACLEOD TR SE$0 $0   Details
Elements and ImprovementsMunicipal Sustainability & Affordable Housing800 MACLEOD TR SE$49,000 $49,000   Details
Plus 15 to McDougallMunicipal Sustainability & Affordable Housing455 6 ST SW$11,000 $11,000   Details
Bridges Upgrade FeasibilityMunicipal Sustainability & Affordable HousingVarious Locations$90,000 $90,000   Details
Telus Convention Centre to Glenbow MuseumMunicipal Sustainability & Affordable Housing130 9 AV SE$30,000 $30,000   Details
Bow Valley Square to Bow ParkadeMunicipal Sustainability & Affordable Housing205 5 AVE SW$30,000 $30,000   Details
YMCA Bridge RetrofitMunicipal Sustainability & Affordable Housing320 5 AV SE$10,000 $10,000   Details
Municipal Building / CPS Plus 15Municipal Sustainability & Affordable Housing800 MACLEOD TR SE$2,500,000 $2,500,000   Details
CORE Mapping Project - Improved GIS Base Mapping Capabilities Municipal Sustainability & Affordable Housing800 MacLeod Tr S$8,700,000 $3,736,000 Spring 2009 Details
Geospatial Emergency Management (GEM)Municipal Sustainability & Affordable Housing800 MacLeod Tr S$2,300,000 $2,240,000 Spring 2010 Details
Buildings RepositoryMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$3,000,000 $2,835,000 Spring 2010 Details
Dynamic Geographical Asset Information ManagementMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$3,206,000 $0 Winter 2012 Details
Survey EquipmentMunicipal Sustainability & Affordable HousingCity Manchester Yards$710,000 $376,000 Winter 2009 Details
Business EquipmentMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$520,000 $191,000 Summer 2009 Details
Survey Control MarkerMunicipal Sustainability & Affordable HousingCity Manchester Yards$663,000 $575,000   Details
GPS Real-Time Kinematic (RTK) NetworkMunicipal Sustainability & Affordable HousingCity Manchester Yards$903,000 $627,000 Winter 2010 Details
Storage Management System For Aerial ImageryMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$255,000 $255,000 Spring 2010 Details
City Online Application UpgradeMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$2,800,000 $1,131,000 Winter 2009 Details
Energy Management StudiesMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$280,000 $231,000   Details
Capital Planning SoftwareMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$3,860,000 $3,290,000 Fall 2009 Details
Sustainable Buildings Partnership ProgramMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$11,700,000 $11,387,000 Winter 2010 Details
Energy Management ProgramMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$8,200,000 $7,708,000 Fall 2009 Details
The Bridges Site 15 - Affordable HousingMunicipal Sustainability & Affordable Housing925 McPherson Rd NE$21,768,000 $21,768,000 Spring 2011 Details
Increase Affordable Housing SupplyMunicipal Sustainability & Affordable Housing800 Macleod Tr S$50,340,000 $50,340,000 Ongoing Details
Manchester Affordable Housing Project (North) LuminoMunicipal Sustainability & Affordable Housing307 55 Av SW$23,750,000 $19,432,000 Sep-09 Details
Financial Incentives Pilot ProgramMunicipal Sustainability & Affordable Housing800 Macleod Tr S$0 $0 October 2009 Details
Secondary Suites Grant ProgramMunicipal Sustainability & Affordable Housing800 Macleod Tr S$6,250,000 $2,183,000 2009 Details
VIDAMunicipal Sustainability & Affordable Housing333 17 Av NW$12,011,000 $2,183,000 Dec 2009 Details
ParkdaleMunicipal Sustainability & Affordable Housing3416 3 Av NW$6,011,000 $2,183,000 Sept 2012 Details
Crescent HeightsMunicipal Sustainability & Affordable Housing210,212 15 Av NE$6,705,000 $2,183,000 Sept 2012 Details
KingslandMunicipal Sustainability & Affordable Housing725-735 Glenmore Tr SW$10,569,000 $2,183,000 Sept 2012 Details
Aurora Business ParkMunicipal Sustainability & Affordable HousingNorth East Calgary (West of Deerfoot Trail / South of 96 Avenue)$75,735,000 $75,735,000   Details
Bow Valley Centre Development (The Bridges)Municipal Sustainability & Affordable HousingBridgeland$2,482,000 $2,482,000 2001 Details
Lincoln Park (ATCO) / Westmount Business Park (696-CFB)Municipal Sustainability & Affordable HousingLincoln Park$15,563,000 $15,563,000 Fall 2011 Details
Royal Vista Business ParkMunicipal Sustainability & Affordable HousingRoyal Vista$11,105,000 $11,105,000 Spring 2009 Details
Dufferin North Industrial ParkMunicipal Sustainability & Affordable HousingEast Shepard Industrial$21,872,000 $21,872,000 2010 Details
EastfieldMunicipal Sustainability & Affordable HousingEastfield$109,000 $109,000   Details
Forest Lawn Creek Industrial ParkMunicipal Sustainability & Affordable HousingStarfield$2,623,000 $2,623,000   Details
Great Plains IV Industrial ParkMunicipal Sustainability & Affordable HousingGreat Plains$11,763,000 $11,763,000 Summer 2008 Details
Point Trotter IndustrialMunicipal Sustainability & Affordable HousingPt. Trotter$37,935,000 $37,935,000 2011 Details
Dufferin Industrial (East Shepard)Municipal Sustainability & Affordable Housing98th Ave SE / 52 St. SE$177,000 $177,000   Details
Southbend Business ParkMunicipal Sustainability & Affordable Housing114 Ave. S.E. / Barlow Tr. SE$155,000 $155,000   Details
Shepard Industrial ParkMunicipal Sustainability & Affordable HousingShepard$110,684,000 $110,684,000 2011 Details
Eastlake Industrial ParkMunicipal Sustainability & Affordable HousingEast Shepard Industrial$2,971,000 $2,971,000 2003 Details
Anderson Transit Oriented DevelopmentMunicipal Sustainability & Affordable HousingAnderson Station$3,042,000 $3,042,000   Details
David Oughton DevelopmentMunicipal Sustainability & Affordable Housing1511 34 Street SE Calgary$494,000 $494,000 2011 Details
RB Bennett DevelopmentMunicipal Sustainability & Affordable Housing6305 33 Ave NW Calgary$494,000 $494,000 2011 Details
Surplus School Sites RedevelopmentMunicipal Sustainability & Affordable Housing $400,000 $400,000   Details
RailtownMunicipal Sustainability & Affordable HousingSE Calgary$575,000 $575,000 N/A Details
East Hills EstatesMunicipal Sustainability & Affordable Housing $430,000 $430,000   Details
Block 40 Redevelopment ProgramMunicipal Sustainability & Affordable Housing700 Macleod Tr S$6,240,000 $6,240,000 2008 Details
Capital Asset AcquisitionMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$9,412,000 $5,057,000 2009Q1 Details
Working Space InitiativeMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$9,500,000 $6,147,000 2009Q1 Details
Land Use Bylaw Implementation & SustainmentMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$2,541,000 $2,541,000   Details
Advanced Passenger Information System: Next C-Train / Bus Stage 1: LRT, Stage 2: BRT and BusesMobility928 32 Av NE$17,746,000 $17,746,000 2009 Details
Four Car Platforms-201 North And South LRT Stations (TIIP)MobilityC-Train stations on the NW and S legs$78,019,000 $78,019,000 2010 Details
LRT Station Refurbishment (New Fed Grant) (TIIP)MobilityC-Train stations on the NE leg.$24,855,000 $24,855,000 2010 Details
LRT Closed Circuit Television (CCTV) System ReplacementMobility928 32 Av NE$2,018,000 $2,018,000 2010 Details
Fare Collection Equipment & SystemMobility928 32 Av NE$7,020,000 $7,020,000 2011 Details
LRT Platform ReconstructionMobility400 7 Av SW$11,400,000 $86,156,000 Early 2010 Details
LRT Platform ReconstructionMobilityMacleod Trail /7th Avenue$25,000,000 $86,156,000 Early 2010 Details
10th Street SW and 11th Street SW LRT Platform ReconstructionMobilityWest of 10th Street SW/7th Avenue$86,156,000 $86,156,000 2011 Details
Big Buses / Community Shuttle Buses (TIIP)Mobility928 32 Av NE$71,703,000 $71,703,000 2010 Details
Light Rail Vehicles (LRV) for LRTMobility928 32 Av NE$124,154,000 $124,154,000 2010 Details
13 Avenue Heritage Greenway 13 Avenue S from 1Street SE to 4 Street SW$12,863,000 $12,863,000 Spring 2011 Details
New Traffic Signals and Pedestrian CorridorsMobility10th Avenue /14th Street SW$2,942,000 $2,942,000 Summer 2011 Details
New Traffic Signals and Pedestrian CorridorsMobilityDouglas Glen Boulevard/18 Steet SE$2,942,000 $2,942,000 Summer 2011 Details
New Traffic Signals and Pedestrian CorridorsMobilityQuarry Park Boulevard/24 Street SE$2,942,000 $2,942,000 Summer 2011 Details
New Traffic Signals and Pedestrian CorridorsMobilityRiverview Circle/21 Street SE$2,942,000 $2,942,000 Summer 2011 Details
New Traffic Signals and Pedestrian CorridorsMobilityShawville Gate/6 Street SW$2,942,000 $2,942,000 Summer 2011 Details
New Traffic Signals and Pedestrian CorridorsMobility10 Avenue /19 Street SW$2,942,000 $2,942,000 Summer 2011 Details
New Traffic Signals and Pedestrian CorridorsMobility20 Avenue /2 Street NW$2,942,000 $2,942,000 Summer 2011 Details
New Traffic Signals and Pedestrian CorridorsMobility26 Avenue/69 Street SW$2,942,000 $2,942,000 Summer 2011 Details
New Traffic Signals and Pedestrian CorridorsMobilityCountry Hills Blvd/Metis Trail NE$2,942,000 $2,942,000 Summer 2011 Details
New Traffic Signals and Pedestrian CorridorsMobilityQuarry Gate/Quarry Park Blvd SE$2,942,000 $2,942,000 Summer 2011 Details
New Traffic Signals and Pedestrian CorridorsMobility11 Avenue/Oylimpic Way SE$2,942,000 $2,942,000 Summer 2011 Details
New Traffic Signals and Pedestrian CorridorsMobilityAshworth Road/Heritage Drive SE$2,942,000 $2,942,000 Fall 2011 Details
New Traffic Signals and Pedestrian CorridorsMobilityChurchill Drive/Heritage Drive SE$2,942,000 $2,942,000 Fall 2011 Details
Noise Attenuation RetrofitMobilityCrowchild Tr NW: South of 16th Avenue to 14th Avenue NW$2,511,000 $2,511,000 Summer 2011 Details
Noise Attenuation RetrofitMobilityCountry Hills Blvd between Panorama Hills Blvd to Panorama Hills Green$2,511,000 $2,511,000 Fall 2010 Details
Downtown Pedestrian Bridge over Bow River: Peace BridgeMobilityJust west of Princess Island near 8 Street W.$24,500,000 $6,802,000 Winter 2009 Details
McHugh Bluff Stairs at 7th ST NWMobilitySunnyside$600,000 $600,000 Fall 2011 Details
Schooner Landing over Stoney Tr. Pedestrian Overpass Schooner Landing / stoney Tr. N.W.$5,000,000 $0 2011 Details
Heritage LRT Pedestrian Overpass Near Heritage LRT Station S.W.$5,000,000 $0 Fall 2011 Details
Grade Separation of Road and Rail LineMobilityValleyfield: Barlow at 50th Ave SE$30,000,000 $630,000 Summer 2010 Details
Glenmore Trail / 37 Street SWMobilityGlenmore Trail / 37 Street SW$10,724,000 $10,724,000 Spring 2010 Details
Traffic Management - Major Projects 24 Street SW / 86 AV S$718,000 $718,000   Details
96 Avenue NE Extension and Airport Trail/Deerfoot Trail Interchange Upgrade Between Harvest Gold Mr. NE and the east side of the Airport TR/Deerfoot TR interchange$40,941,000 $40,941,000 2010 Details
Trans Canada Highway / Bowfort Road InterchangeMobilityTrans Canada Highway / Bowfort Road Interchange$74,970,000 $74,970,000 2012 Details
4 St SE UnderpassMobility4th St SE, between 9th Av and 10th Av (under the CPR tracks), to connect the East Village with Victoria Park and the Stampede Grounds.$28,000,000 $14,000,000 2010 Details
Extension of LRT service from Crowfoot Station to Rocky Ridge.MobilityNW Calgary$115,000,000 $92,632,000 Winter 2009 Details
NE LRT Extension to SaddleridgeMobilityMcKnight/Westwinds to Saddletown Station$83,651,000 $64,997,000 Summer 2009 Details
Metis Tr / 64 Av NE Intersection UpgradesMobilityMetis Tr and 64 Av NE$8,457,000 $8,457,000 2010 Details
Major Road ReconstructionMobilityVarious locations throughout Calgary including Edmonton Trail, Elbow Drive, Centre Street$27,056,000 $13,242,000 Summer 2010 Details
Airport Trail UnderpassMobilityAirport Trail between Deerfoot Trail and Barlow Trail and Extending Airport Trail NE through the tunnel to 36 Street NE$258,800,000 $258,800,000 Summer 2011 Details
Operational Improvement ProjectsMobilityVarious Locations$10,282,000 $10,282,000 Spring 2012 Details
Mount Royal ConservatoryCommunity DevelopmentMount Royal University Campus$67,300,000 $10,300,000 2011 Mar Details
Calgary Folk Music Festival Hall ProjectCommunity Development1215 - 10 Ave SE$5,200,000 $669,000 2009 Nov Details
Cantos National Music MuseumCommunity Development9 Av SE & 4 St SE$132,500,000 $22,500,000 Pending Details
Nickle Arts MuseumCommunity DevelopmentUniversity of Calgary Campus$50,500,000 $3,234,000 Complete Details
Calgary Housing Company - Technology System UpgradeMunicipal Sustainability & Affordable Housing1701 Centre St NW$1,386,000 $678,000 January 2009 Details
Calgary Housing Company - Building ImprovementsMunicipal Sustainability & Affordable HousingVarious Locations$26,716,000 $5,712,000 June 2009 Details
Calgary Housing Company - Independence HouseMunicipal Sustainability & Affordable Housing515 4A St. NE$3,625,000 $3,262,000 May 2009 Details
Corporate Contact CentreMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$3,477,000 $1,630,000 2009 Details
52 St E Widening between Glenmore Tr. To 130 Ave S.Mobility52nd St SE between Glenmore Tr. and 130 Ave SE$89,131,000 $53,520,000 Spring 2008 Details
Provincial Ring Road Connector ProjectsMobilityFrom 52 Street to 68 Street SE$19,500,000 $34,048,000 Summer 2009 Details
Metis Trail Extension NEMobility $37,653,000 $37,653,000   Details
West LRTMobilitySW Calgary$470,540,000 $470,540,000 Early 2010 Details
Landfill Cells at East Calgary LandfillEnvironmental SustainabilitySE Calgary$2,000,000 $60,489,000 Ongoing Details
Landfill Cells at Shepard LandfillEnvironmental SustainabilitySE Calgary$2,000,000 $60,489,000 Ongoing Details
Landfill Cells at Spyhill LandfillEnvironmental SustainabilityNW Calgary$2,000,000 $60,489,000 Ongoing Details
Road Upgrades at East Calgary LandfillEnvironmental SustainabilitySE Calgary$60,489,000 $60,489,000 2012 Details
Road Upgrades at Shepard LandfillEnvironmental SustainabilitySE Calgary$60,489,000 $60,489,000 2012 Details
Road Upgrades at Spyhill LandfillEnvironmental SustainabilityNW Calgary$60,489,000 $60,489,000 2012 Details
Spyhill Landfill Stormwater Management - Interim Stormwater InfrastructureEnvironmental SustainabilityNW Calgary$60,489,000 $60,489,000 2012 Details
Spyhill Landfill Stormwater Management - Risk Assessment of Pond D DamEnvironmental SustainabilityNW Calgary$60,489,000 $60,489,000 2012 Details
Landfill Leachate Pre-treatmentEnvironmental SustainabilitySE Calgary$3,000,000 $60,489,000 Winter 2012 Details
Landfill Closure Fund ProjectsEnvironmental Sustainability800 Macleod Trail SE$60,489,000 $60,489,000 Ongoing Details
Nose Creek Inactive Landfill RemediationEnvironmental SustainabilityNE Calgary$60,489,000 $60,489,000 Winter 2012 Details
Landfill Remediation at Spyhill LandfillEnvironmental SustainabilityNW Calgary$2,000,000 $60,489,000 Winter 2012 Details
Leachate Management - Functional StudyEnvironmental SustainabilityVarious Locations$450,000 $60,489,000 Winter 2012 Details
Soil Vapour Extract SystemEnvironmental SustainabilityNW Calgary$5,000,000 $60,489,000 Spring 2010 Details
Organics Pilot ProgramEnvironmental SustainabilitySE Calgary$900,000 $18,581,000 Winter 2012 Details
Shepard Stormwater ManagementEnvironmental SustainabilitySE Calgary$59,963,000 $59,963,000 Spring 2012 Details
Storm Water Pre-Treatment SystemsEnvironmental SustainabilitySE Calgary$59,963,000 $59,963,000 TBD Details
Completion of Stormwater Management Facilities at East Calgary LandfillEnvironmental SustainabilitySE Calgary$8,295,000 $59,963,000 Summer 2010 Details
Landfill Gas Collection System Extension at Shepard LandfillEnvironmental SustainabilitySE Calgary$59,963,000 $59,963,000 Spring 2012 Details
Landfill Gas Collection System Extension at East Calgary LandfillEnvironmental SustainabilitySE Calgary$59,963,000 $59,963,000 Spring 2012 Details
Landfill Gas Collection System at Spyhill LandfillEnvironmental SustainabilityNW Calgary$59,963,000 $59,963,000 Spring 2012 Details
Spyhill Landfill UpgradesEnvironmental SustainabilityNW Calgary$12,391,000 $59,963,000 Fall 2011 Details
East Calgary Landfill UpgradesEnvironmental SustainabilitySE Calgary$12,509,000 $59,963,000 Summer 2012 Details
East Calgary Collection Services DepotEnvironmental SustainabilitySE Calgary$59,963,000 $59,963,000 Summer 2012 Details
Spyhill Collection Services DepotEnvironmental SustainabilityNW Calgary$59,963,000 $59,963,000 Fall 2012 Details
Commercial Container Equipment & FacilitiesEnvironmental Sustainability800 Macleod Trail SE$59,963,000 $59,963,000 Ongoing Details
Integrated Collection System SoftwareEnvironmental SustainabilitySE Calgary$2,970,000 $59,963,000 Summer 2008 Details
Capital Maintenance for Glenmore Water Treatment PlantEnvironmental SustainabilityNorth Glenmore$6,166,000 $50,977,000 ongoing Details
Capital Maintenance for Bearspaw Water Treatment PlantEnvironmental Sustainability1634 56 Av SW$18,246,000 $50,977,000 ongoing Details
Glenmore Water Treatment Plant UpgradeEnvironmental Sustainability1634 56 Av SW$218,722,000 $13,348,000 Spring 2004 Details
Capital Maintenance for PumpstationsEnvironmental SustainabilityNorth Glenmore$4,177,000 $95,210,000 ongoing Details
Valley Ridge FeedermainEnvironmental SustainabilityBowness / Valleyridge$18,165,000 $95,210,000 Winter 2007 Details
Big Hill East ReservoirEnvironmental SustainabilitySee File previously sent$13,715,000 $95,210,000 Summer 2010 Details
Cranston - Bow River Feedermain CrossingEnvironmental SustainabilityCranston$12,600,000 $95,210,000 Fall 2008 Details
MacLeod Trail FeedermainEnvironmental Sustainability $20,739,000 $95,210,000 Summer 2009 Details
Capital Maintenance for Bonnybrook Wastewater Treatment PlantEnvironmental SustainabilityBonnybrook WWTP$15,955,000 $75,400,000 ongoing Details
Capital Maintenance for Fish Creek Wastewater Treatment PlantEnvironmental Sustainability $5,321,000 $75,400,000 ongoing Details
Effluent Filtration at Bonnybrook Wastewater Treatment PlantEnvironmental SustainabilityBonnybrook WWTP$50,409,000 $75,400,000   Details
Digester Gas UtilizationEnvironmental SustainabilityBonnybrook WWTP$14,000,000 $75,400,000 Spring 2010 Details
Nose Creek Wastewater NetworkEnvironmental Sustainability $58,495,000 $123,633,000 Summer 2010 Details
Silverado - West Pine Creek Wastewater NetworkEnvironmental SustainabilitySee Map$16,000,000 $123,633,000 Winter 2010 Details
South Cranston SiphonEnvironmental SustainabilityCranston$13,226,000 $123,633,000 Fall 2008 Details
Saddleridge Relief Sanitary SewerEnvironmental SustainabilitySaddleridge$6,000,000 $123,633,000 On Hold Details
Bonnybrook Wastewater Network LineEnvironmental SustainabilityInglewood$32,963,000 $10,284,000 Winter 2005 Details
MahoganyEnvironmental SustainabilityMahogany$5,600,000 $16,510,000 Summer 2010 Details
Lakeview Storm System ImprovementEnvironmental SustainabilityLakeview$17,362,000 $16,510,000 Spring 2010 Details
Major Stormwater Quality Improvements: Greenview & McCallEnvironmental SustainabilityGreenview Industrial Park$4,000,000 $17,995,000 Spring 2010 Details
Major Stormwater Quality Improvements: 54 Street S.E. PondEnvironmental SustainabilitySE Calgary$17,200,000 $17,995,000 Fall 2010 Details
Major Stormwater Quality Improvements: Bowmont WestEnvironmental SustainabilityNW Calgary$17,995,000 $17,995,000   Details
Police Equipment - UpgradeCommunity Safety133 - 6th Avenue S.E.$155,000 $155,000   Details
Police Equipment - ReplacementCommunity Safety133 - 6th Avenue S.E.$1,399,000 $1,399,000 Ongoing Details
Red Light Enforcement ProjectCommunity Safety133 - 6th Avenue S.E.$1,771,000 $1,771,000 Ongoing Details
Telecom Equipment - ReplacementCommunity Safety133 - 6th Avenue S.E.$1,902,000 $1,902,000   Details
AFIS Equipment - UpgradeCommunity Safety133 - 6th Avenue S.E.$1,086,000 $1,086,000 ongoing Details
StableCommunity Safety133 6 AV SE$461,000 $461,000   Details
Car WashCommunity Safety133 6 AV SE$714,000 $714,000   Details
Forensics Lab & Exam CentreCommunity Safety133 6 AV SE$771,000 $771,000   Details
North Service Centre AdditionsCommunity Safety133 6 AV SE$931,000 $931,000   Details
Driver Training TrackCommunity Safety133 6 AV SE$6,983,000 $6,983,000   Details
Outdoor RangeCommunity Safety133 6 AV SE$6,640,000 $6,640,000   Details
Annex Building - SpyhillCommunity Safety133 6 AV SE$8,750,000 $8,750,000   Details
District 5 - SaddleridgeCommunity Safety133 6 AV SE$277,000 $277,000   Details
WestwindsCommunity Safety133 6 AV SE$19,065,000 $19,065,000   Details
Sports Hall of Fame and MuseumCommunity DevelopmentCanada Olympic Park Rd$30,000,000 $3,220,000 Complete Details
Vehicle and Equipment ReplacementsMunicipal Sustainability & Affordable HousingCity Manchester Yards$65,882,000 $65,882,000 Fall 2008 Details
New Vehicles and EquipmentMunicipal Sustainability & Affordable HousingCity Manchester Yards$48,000,000 $12,025,000 Winter 2009 Details
Maintenance Management Systems Upgrades and AdditionsMunicipal Sustainability & Affordable HousingCity Manchester Yards$1,990,000 $1,937,000 On-Going Details
Fleet Machinery Replacement and Building MaintenanceMunicipal Sustainability & Affordable HousingCity Manchester Yards$4,800,000 $3,975,000 On-Going Details
Furniture & FixturesMunicipal Sustainability & Affordable HousingCity Manchester Yards$400,000 $402,000 On-Going Details
Satellite DepotsMunicipal Sustainability & Affordable HousingNorth Calgary$1,500,000 $1,544,000 2013 Details
Records ManagementMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$1,000,000 $615,000 Fall 2009 Details
Corporate Workforce StrategyMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$496,000 $496,000 2009 Details
Enterprise Support ServicesMunicipal Sustainability & Affordable Housing711 3 St SE$12,000,000 $8,790,000 2009 Details
Corporate Computers & TelecommunicationsMunicipal Sustainability & Affordable Housing711 3 St SE$9,000,000 $1,545,000 Winter 2010 Details
Lifecycle Replacement - Data CentreMunicipal Sustainability & Affordable Housing711 3 St SE$16,556,000 $6,375,000 Spring 2009 Details
Lifecycle Replacement - IT InfrastructureMunicipal Sustainability & Affordable Housing711 3 St SE$17,000,000 $10,196,000 Spring 2009 Details
Lifecycle Replacement - DesktopMunicipal Sustainability & Affordable Housing711 3 St SE$6,000,000 $2,977,000 Fall 2009 Details
Information WorkplaceMunicipal Sustainability & Affordable Housing711 3 St SE$1,000,000 $460,000   Details
Extended Core InfrastructureMunicipal Sustainability & Affordable Housing711 3 St SE$5,049,000 $5,049,000 2009 Details
Infrastructure Management SystemsMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$8,749,000 $8,749,000 2010 Details
Web-Based InitiativesMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$8,712,000 $5,320,000 2009 Details
Assessment / Tax / Complaint Phase 2Municipal Sustainability & Affordable Housing711 3 St SE$8,850,000 $8,850,000 2009 Details
E-GovernmentMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$7,599,000 $7,599,000 Fall 2009 Details
IT Fibre OpticsMunicipal Sustainability & Affordable Housing711 3 St SE$2,000,000 $2,000,000 2009 Details
IT Development PoolMunicipal Sustainability & Affordable Housing711 3 St SE$11,963,000 $11,963,000 2009 Details
Application RenewalMunicipal Sustainability & Affordable Housing711 3 St SE$10,000,000 $651,000 2009 Details
Safety Monitoring And Business EquipmentEnvironmental Sustainability800 Macleod TR SE$100,000 $265,000 Spring 2009 Details
Environmental RemediationEnvironmental SustainabilitySpy Hill: 11808 - 69 ST NW; WV: 1720-1920 Bow TR SW$4,000,000 $4,095,000 Fall 2011 Details
Digital InformationEnvironmental Sustainability800 Macleod TR SE$675,000 $543,000 Winter 2011 Details
Green Fleet, Green OfficeEnvironmental Sustainability800 Macleod TR SE$725,000 $607,000 On-Going Details
Data ManagementEnvironmental Sustainability800 Macleod TR SE$1,278,000 $543,000 Spring 2008 Details
Air Quality StationEnvironmental SustainabilityTBD$150,000 $150,000 Spring 2012 Details
Former Imperial Oil Refinery Site RemediationEnvironmental Sustainability5305 Ogden RD SE$1,473,000 $796,000 Winter 2009 Details
Payment Card Industry (PCI) ComplianceMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$4,040,000 $3,955,000 2009 Details
Supply Fixtures, Furnishings & EquipmentMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$1,804,000 $622,000 Jan 2009 Details
Fueling System UpgradeMunicipal Sustainability & Affordable HousingVarious fuel sites$1,264,000 $863,000 Jul 2009 Details
Security Equipment / Systems ImplementationMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$2,000,000 $372,000 2009 Details
Capital Investment in Civic PartnersCommunity DevelopmentVarious$15,000,000 $3,072,000 Yes Details
Outdoor Pool PartnersCommunity Development918 16 Av NW $1,080,000 $360,000 Ongoing Details
New Central (Downtown) LibraryCommunity Development616 MacLeod Tr SE $235,400,000 $30,209,000 Pending Details
Signal Hill Library ExpansionCommunity Development5994 Signal Hill Centre SW$5,100,000 $578,000 2010 April Details
Calgary Technology Inc - Alberta Research Technology Centre (ARTC) Phase IIICommunity Development3553 31 St NW $37,000,000 $37,000,000   Details
Telus Convention Centre - Lifecycle MaintenanceCommunity Development120 9 Ave SE$880,000 $200,000 Ongoing Details
Calgary Zoo- Lifecycle MaintenanceCommunity Development1300 Zoo Rd NE$812,000 $273,000 Ongoing Details
Calgary Zoo - Antarctic Landing and Northgate DevelopmentCommunity Development1300 Zoo Rd NE$83,000,000 $9,634,000 Early 2010 Details
Fort Calgary - Community Investment Fund (CIF)Community Development806 9 Av SE$6,000,000 $1,890,000 Pending Details
Fort Calgary- Lifecycle MaintenanceCommunity Development750 9 Av SE $393,000 $135,000 Ongoing Details
Heritage Park- Lifecycle MaintenanceCommunity Development1900 Heritage Dr SW$986,000 $337,000 Ongoing Details
Culture ArtifactCommunity Development $800,000 $800,000   Details
Talisman - Lifecycle MaintenanceCommunity Development2225 MacLeod Tr SE$1,078,000 $367,000 Ongoing Details
Telus World of Science CentreCommunity Development220 St. George's Dr NE$132,500,000 $7,844,000 Fall 2009 Details
Telus World of Science Centre- Lifecycle MaintenanceCommunity Development701 11 St SW$843,000 $288,000 Ongoing Details
New Science CentreCommunity Development220 St. George's Dr NE$18,700,000 $8,567,000 Fall 2009 Details
Maintenance Vehicles & EquipmentMobility620 - 9 Avenue SW$444,000 $444,000 On-Going Details
City Centre ParkadeMobilityCity Centre Parkade$2,856,000 $2,856,000   Details
Civic Plaza ParkadeMobilityCivic Plaza Parkade$564,000 $564,000 On-Going Details
James Short ParkadeMobilityJames Short Parkade$1,381,000 $1,381,000 On-Going Details
Centennial ParkadeMobility12 Av SW & 8 St SW$1,670,000 $1,670,000 On-Going Details
Kensington/Anthill DevelopmentMobilityKensington$47,000 $47,000   Details
McDougall ParkadeMobility620 - 9 Avenue SW$1,684,000 $1,684,000 On-Going Details
Future Facilities Design & ConsultingMobility620 - 9 Avenue SW$561,000 $561,000 On-Going Details
Future Maintenance/iLot Building/StorageMobility620 - 9 Avenue SW$6,539,000 $6,539,000 On-Going Details
Impound LotMobility400 - 39 Avenue SE$362,000 $362,000 On-Going Details
Convention Centre ParkadeMobility120 9 AVE SE$649,000 $649,000 On-Going Details