Project Name Project Type Project Location Est. Project Cost 2010-2014 Budget Construction/Purchase Start Project Details
Outdoor Pool PartnersCommunity Development918 16 Av NW $1,080,000 $1,080,000 Ongoing Details
New Central (Downtown) LibraryCommunity Development616 MacLeod Tr SE $235,400,000 $30,209,000 Pending Details
Signal Hill Library ExpansionCommunity Development5994 Signal Hill Centre SW$5,100,000 $1,700,000 2010 April Details
Calgary Technology Inc - Alberta Research Technology Centre (ARTC) Phase IIICommunity Development3553 31 St NW $37,000,000 $37,000,000   Details
Telus Convention Centre - Lifecycle MaintenanceCommunity Development120 9 Ave SE$880,000 $880,000 Ongoing Details
Calgary Zoo- Lifecycle MaintenanceCommunity Development1300 Zoo Rd NE$812,000 $812,000 Ongoing Details
Calgary Zoo Parking Lot ExpansionCommunity Development1300 Zoo Rd NE$7,000,000 $5,040,000 Spring 2009 Details
Calgary Zoo - Antarctic Landing and Northgate DevelopmentCommunity Development1300 Zoo Rd NE$83,000,000 $22,557,000 Early 2010 Details
Capital Investment in Civic PartnersCommunity DevelopmentVarious$15,000,000 $5,035,000 Yes Details
Sports Hall of Fame and MuseumCommunity DevelopmentCanada Olympic Park Rd$30,000,000 $5,000,000 2010 Feb Details
Mount Royal ConservatoryCommunity DevelopmentMount Royal University Campus$63,000,000 $8,000,000 2011 Mar Details
Calgary Folk Music Festival Hall ProjectCommunity Development1215 - 10 Ave SE$5,200,000 $1,831,000 2009 Nov Details
Cantos Music Museum - King Eddy ProjectCommunity Development9 Av SE & 4 St SE$100,000,000 $25,000,000 Pending Details
Nickle Arts MuseumCommunity DevelopmentUniversity of Calgary Campus$50,500,000 $3,234,000 2009 Details
Fort Calgary - Community Investment Fund (CIF)Community Development806 9 Av SE$6,000,000 $1,890,000 Pending Details
Fort Calgary- Lifecycle MaintenanceCommunity Development750 9 Av SE $393,000 $393,000 Ongoing Details
Heritage Park - Community Investment Fund (CIF)Community Development1900 Heritage Dr SW$47,000,000 $2,404,000 Fall 2006 Details
Heritage Park- Lifecycle MaintenanceCommunity Development1900 Heritage Dr SW$986,000 $986,000 Ongoing Details
Talisman - Lifecycle MaintenanceCommunity Development2225 MacLeod Tr SE$1,078,000 $1,078,000 Ongoing Details
Talisman Centre Roof ReplacementCommunity Development2225 MacLeod Tr SE$41,500,000 $39,092,000 2010 Jan Details and Photos
Telus World of Science CentreCommunity Development220 St. George's Dr NE$130,000,000 $18,000,000 Fall 2009 Details and Photos
Telus World of Science Centre- Lifecycle MaintenanceCommunity Development701 11 St SW$843,000 $843,000 Ongoing Details
New Science CentreCommunity Development220 St. George's Dr NE$18,700,000 $18,700,000 Fall 2009 Details
Spay and Neuter ClinicCommunity Safety2201 Portland Street SE$1,542,000 $1,542,000 Project Completed Details
Clean To The Core' Response FacilityCommunity Safety1807 MACLEOD TR SE$1,000,000 $1,000,000 Q3 - 2010 Details and Photos
Equipment LifecycleCommunity Safety2201 Portland Street SE  $507,000   Details
Land - Valley, Symons, Douglas, Bridlewood, SetonCommunity SafetyVarious Locations$2,181,000 $2,181,000 2010 Details
Signal Hill Emergency Response Station (Lower Springbank)Community Safety3800 69 St SW$12,200,000 $12,200,000   Details and Photos
Royal Oak Emergency Response Station (Royal Vista)Community SafetyRoyal Oak$17,259,000 $17,259,000 Spring 2012 Details
Louise Station (Emergency Response Station)Community Safety360 8 St SW$13,600,000 $13,600,000 Spring 2008 Details and Photos
Calgary Emergency Apparatus Maintenance FacilityCommunity Safety1755 18 Av NE$26,000,000 $26,000,000 Spring 2008 Details and Photos
Environmental Training FacilityCommunity Safety5727 23 Av SE$10,000,000 $10,000,000 Spring 2009 Details and Photos
Calgary Emergency Operations CentreCommunity Safety800 MacLeod Tr S$36,830,000 $36,830,000 Winter 2008 Details
Valleyridge Emergency Response StationCommunity Safety11280 Valley Ridge Bl NW$12,500,000 $12,500,000 Spring 2008 Details and Photos
Skyview Ranch Emergency Response House (Temporary)Community Safety3 Skyview Ranch Cv NE$1,350,000 $1,350,000 Spring 2009 Details and Photos
Tuscany Temporary Emergency Response House And LandCommunity SafetyTuscany$4,820,000 $4,820,000 Fall 2012 Details
Bridlewood Emergency Response StationCommunity Safety2511 Eversyde Av SW$15,800,000 $15,800,000 Fall 2012 Details
Symons Valley Emergency Response StationCommunity SafetySymons Valley$16,124,000 $16,124,000 Spring 2011 Details
Douglas Glen Emergency Response StationCommunity Safety4199 114 Av SE$15,800,000 $15,800,000 Spring 2011 Details
Seton Emergency Response StationCommunity SafetySeton$19,200,000 $19,200,000 Spring 2011 Details
Emergency Response Houses and LandCommunity SafetyVarious$6,000,000 $6,000,000 2010 Details
N.E. Emergency Response StationCommunity Safety123 44 St SE$11,000,000 $11,000,000 Fall 2014 Details
Fire Station #5 Replacement/RebuildCommunity Safety3129 14 St SW$15,250,000 $15,250,000 Spring 2011 Details
Fire Station #11 Replacement/RebuildCommunity Safety5536 4 St SW$17,250,000 $17,250,000 Spring 2012 Details
Fire Station #15 Replacement/RebuildCommunity Safety6328 35 Av NW$6,000,000 $6,000,000 Fall 2009 Details
Facility RehabilitationCommunity SafetyVarious Locations$13,214,000 $13,214,000 2013 Details
Emergency Generator / Off Grid SustainmentCommunity SafetyVarious Locations$6,800,000 $6,800,000 2011 Details
Replacement EmergenciesCommunity SafetyVarious$43,615,000 $43,620,000 2009 Details
Legacy Park - Bearspaw HaskayneCommunity DevelopmentNW Calgary$6,270,000 $51,010,000   Details
Legacy Park - Ralph KleinCommunity DevelopmentSE Calgary$32,000,000 $51,010,000 Winter 2007 Details and Photos
Clearwater ParkCommunity DevelopmentNorth side of Highway 8 west of 69 street SW  $51,010,000 TBD subject to future funding approval Details
Memorial Drive Plaza Redevelopment - Phase 2Community DevelopmentSunnyside$9,000,000 $42,870,000 Summer 2009 Details
Memorial Drive- Median, Boulevard and LandscapingCommunity DevelopmentSunnyside$7,000,000 $42,870,000 Summer 2008 Details and Photos
Central Memorial ParkCommunity DevelopmentBeltline$6,500,000 $42,870,000 Spring 2008 Details and Photos
Nose Hill ParkCommunity DevelopmentNosehill Park$10,000,000 $42,870,000 Spring 2009 Details
Major Parks-LifecycleCommunity Development205 8 Av SE  $765,000   Details
New Parks Land AcquisitionCommunity DevelopmentShepard, Bearspaw, Cougar Ridge Adjacent top of ridge west of COP  $5,773,000   Details
Devonian Gardens Upgrades and RetrofitsCommunity DevelopmentTD Square 8th Ave SW$23,000,000 $30,265,000   Details
New Parks PathwaysCommunity DevelopmentVarious Locations$6,817,000 $5,740,000   Details
Parks Pathway Lifecycle MaintenanceCommunity DevelopmentVarious Locations$9,335,000 $7,309,000   Details
Public Safety Communication Telecommunication Systems UpgradeCommunity Safety800 MacLeod Tr S$2,625,000 $3,901,000 Spring 2009 Details
Central Communication Hardware ReplacementCommunity Safety   $2,750,000   Details
Golf Courses � Lifecycle MaintenanceCommunity Development800 MacLeod Trail SE$2,775,000 $2,775,000 Ongoing Details
Capital Conservation GrantsCommunity DevelopmentVarious Locations$8,033,000 $8,032,000 Ongoing Details
Soccer Centre - Artificial TurfCommunity Development7000 48 St SE$13,000,000 $4,500,000 Pending Details
Arenas - NewCommunity Development800 MacLeod Trail SE  $898,000   Details
Arenas - Upgrade/RetrofitCommunity Development800 MacLeod Trail SE  $45,000   Details
Arenas � LifecycleCommunity Development800 MacLeod Trail SE$46,000 $46,000 Ongoing Details
Athletic Parks � LifecycleCommunity Development800 MacLeod Trail SE$4,000,000 $4,000,000 Ongoing Details
New Brighton Athletic ParkCommunity Development130 Av SE and 52nd St SE$8,575,000 $8,575,000 Pending Details
Foothills Athletic ParkCommunity Development2424 University Dr NW$2,000,000 $45,613,000 Fall 2010 Details
Shouldice Athletic ParkCommunity Development1515 Home Rd NW$3,000,000 $30,165,000 Summer 2009 Details
Pools - Upgrade/RetrofitCommunity Development800 12 St NW  $190,000 Spring 2009 Details
Pumphouse TheatreCommunity Development2140 Pumphouse Av SW$11,800,000 $2,272,000 Pending Details
Sailing School - Upgrade/RetrofitCommunity Development8415 24 St SW  $423,000   Details
Southland Leisure Centre - UpgradeCommunity Development2000 Southland Dr SW  $1,212,000   Details
Village Square Leisure CentreCommunity Development2623 56 St NE$11,935,000 $3,768,000 Spring 2008 Details and Photos
Genesis Wellness Centre (formerly NECC)Community Development7556 Falconridge Bl NE$112,000,000 $70,000,000 Fall 2009 Details and Photos
S.E. Regional Recreation CentreCommunity DevelopmentSE Calgary$110,000,000 $70,000,000 Pending Details
N.W. Regional Recreation CentreCommunity DevelopmentNW Calgary$110,000,000 $70,000,000 Pending Details
Trico Centre for Family WellnessCommunity Development11150 Bonaventure Drive SE$14,000 $7,000 Spring 09 Details
Regional Need & Preference StudiesCommunity Development800 MacLeod Trail SE$7,030,000 $7,029,000 2008 Details
Westside Recreation Centre UpgradesCommunity Development2000 69 St SW$31,000,000 $7,800,000 Fall 2008 Details and Photos
Centennial Arena ExpansionCommunity Development2390 47 Av SW$17,000,000 $4,857,000 Fall 2009 Details
Peppard Arena/Glen Ap Site UpgradeCommunity Development5300 19 St SW$143,000 $143,000 TBD Details
Canada Olympic Development Association (CODA)Community Development88 Canada Olympic Rd SW$28,000,000 $20,000,000 Fall 2008 Details
South Fish Creek Recreation AssociationCommunity Development333 Shawville Bl SE$21,300,000 $14,000,000 Fall 2010 Details
Trico Centre for Family WellnessCommunity Development11150 Bonaventure Dr SE$19,500,000 $9,500,000 Fall 2008 Details and Photos
Payment Card Industry (PCI) ComplianceMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$4,000,000 $4,040,000 2009 Details
Supply Fixtures, Furnishings & EquipmentMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$1,800,000 $1,804,000 Jan 2009 Details
Warehouse Consolidation At ManchesterMunicipal Sustainability & Affordable HousingCity Manchester Yards$4,000 $0 Jan 2009 Details
Tangible Capital Asset ModuleMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$560,000 $560,000 Jan 2009 Details
Fueling System UpgradeMunicipal Sustainability & Affordable HousingVarious fuel sites$1,074,000 $1,074,000 Jul 2009 Details
Security Equipment / Systems ImplementationMunicipal Sustainability & Affordable Housing800 MacLeod Tr S  $2,000,000 2009 Details
Calgary Housing Company - Technology System UpgradeMunicipal Sustainability & Affordable Housing1701 Centre St NW$1,386,000 $1,386,000 January 2009 Details
Calgary Housing Company - Building ImprovementsMunicipal Sustainability & Affordable HousingVarious Locations$26,716,000 $26,716,000 June 2009 Details
Calgary Housing Company - Independence HouseMunicipal Sustainability & Affordable Housing515 4A St. NE$3,625,000 $3,625,000 May 2009 Details
Calgary Housing Company - Administrative Furniture and Leasehold ImprovementsMunicipal Sustainability & Affordable Housing1701 Centre St NW$124,000 $124,000 Ongoing; as required Details
Corporate Properties & Buildings - Business SystemsMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$734,000 $734,000 Summer 2009 Details
Corporate - Land Inventory SystemMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$2,422,000 $1,836,000 Fall 2008 Details
Bearspaw Operation Workplace DevelopmentMunicipal Sustainability & Affordable HousingBearspaw Dam Road$2,116,000 $1,758,000   Details
Administration Building (Deerfoot)Municipal Sustainability & Affordable HousingDeerfoot One (Deerfoot & 32nd NE)$12,944,000 $6,948,000 Spring 2009 Details
Manchester Phase 1 DevelopmentMunicipal Sustainability & Affordable HousingCity of Calgary Manchester Yard$3,326,000 $2,412,000   Details
Facility Infrastructure Investment Program (Municipal Building)Municipal Sustainability & Affordable Housing800 MacLeod Tr S$11,632,000 $11,632,000 Summer 2007 Details
Downtown Core - Fitness FacilityMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$1,696,000 $1,696,000   Details
Public Building Heritage RenovationsMunicipal Sustainability & Affordable Housing205 8 Av SE$30,835,000 $17,000,000 Summer 2009 Details
Administration Building - PurchaseMunicipal Sustainability & Affordable Housing133 6 Av SE$50,000,000 $10,000,000 Spring 2009 Details
Municipal Plaza RedevelopmentMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$2,380,000 $4,445,000   Details
Whitehorn Roof/HVAC/ElectricalMunicipal Sustainability & Affordable Housing3705 35 St NE  $8,889,000 2010 Q3 Details
Country Hills Multiservice CentreMunicipal Sustainability & Affordable Housing11955 Country Village Li NE  $0   Details
Saddleridge Multi Service CentreMunicipal Sustainability & Affordable HousingSaddleridge$26,778,000 $22,657,000 2008 Details
Saddleridge (Multi Services Centre) Park SpaceMunicipal Sustainability & Affordable HousingSaddleridge$1,608,000 $1,151,000 Summer 2009 Details
Ergonomic FurnitureMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$5,938,000 $3,965,000 2008 Details
Strategy Development & Pre-Project Planning (Studies)Municipal Sustainability & Affordable Housing800 MacLeod Tr S$219,000 $2,893,000   Details
Workplace CentresMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$1,214,000 $74,000 Spring 2009 Details
Sarcee Operations Workplace Centre Functional & DesignMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$1,705,000 $171,000 Fall 2009 Details
Major Operations Work Centre - BearspawMunicipal Sustainability & Affordable Housing10010 Bearspaw Dam Rd NW$13,487,000 $9,280,000 Pending (Spring 2010) Details
Satellite Operations Work Centre - Richmond GreenMunicipal Sustainability & Affordable HousingCFB Currie$15,096,000 $19,829,000 Pendng (Spring 2010) Details
Satellite Operations Work Centre - Saddle RidgeMunicipal Sustainability & Affordable Housing7400 40 St SE$5,900,000 $2,100,000 Pending (Fall 2010) Details
Major Operations Work Centre - SarceeMunicipal Sustainability & Affordable Housing5851 Richmond Rd SW$13,157,000 $13,325,000 Pending (Fall 2010) Details
Major Operations Work Centre - ShepardMunicipal Sustainability & Affordable Housing6727 114 Av SE$16,486,000 $19,593,000 Pending (Spring 2009) Details
Warehouse Facility ReplacementMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$18,274,000 $18,273,000 Summer 2009 Details
Council Chambers & Other Accessibility IssuesMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$25,000 $0   Details
Building / Equipment ImprovementsMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$7,589,000 $7,918,000   Details
Glenbow MuseumMunicipal Sustainability & Affordable Housing130 9 St SE$2,300,000 $2,300,000   Details
Urgent & Priority RepairsMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$50,000,000 $50,000,000 Q4 2009 Details
Whitehorn RoofMunicipal Sustainability & Affordable Housing3705 35 St NE$14,184,000 $295,000   Details
Corporate Contact CentreMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$3,477,000 $3,477,000 2009 Details
Technology-Supported Communications (Public Emergency Notification System)Municipal Sustainability & Affordable Housing800 MacLeod Tr S$1,585,000 $1,585,000 2009 Details
Vehicle and Equipment ReplacementsMunicipal Sustainability & Affordable HousingCity Manchester Yards$125,200,000 $125,249,000 Fall 2008 Details
New Vehicles and EquipmentMunicipal Sustainability & Affordable HousingCity Manchester Yards$48,000,000 $48,027,000 Winter 2009 Details
Maintenance Management Systems Upgrades and AdditionsMunicipal Sustainability & Affordable HousingCity Manchester Yards$1,990,000 $1,995,000 On-Going Details
Fleet Machinery Replacement and Building MaintenanceMunicipal Sustainability & Affordable HousingCity Manchester Yards$4,800,000 $4,823,000 On-Going Details
Furniture & FixturesMunicipal Sustainability & Affordable HousingCity Manchester Yards$400,000 $402,000 On-Going Details
Satellite DepotsMunicipal Sustainability & Affordable HousingNorth Calgary$1,500,000 $1,544,000 2011 Details
Records ManagementMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$1,000,000 $1,000,000 Fall 2009 Details
Corporate Workforce StrategyMunicipal Sustainability & Affordable Housing800 MacLeod Tr S  $500,000 2009 Details
Enterprise Support ServicesMunicipal Sustainability & Affordable Housing711 3 St SE$12,000,000 $12,000,000 2009 Details
Corporate Computers & TelecommunicationsMunicipal Sustainability & Affordable Housing711 3 St SE$9,000,000 $6,278,000 Winter 2010 Details
Lifecycle Replacement - Data CentreMunicipal Sustainability & Affordable Housing711 3 St SE$16,556,000 $11,000,000 Spring 2009 Details
Lifecycle Replacement - IT InfrastructureMunicipal Sustainability & Affordable Housing711 3 St SE$17,000,000 $17,825,000 Spring 2009 Details
Lifecycle Replacement - DesktopMunicipal Sustainability & Affordable Housing711 3 St SE$6,000,000 $6,100,000 Fall 2009 Details
Information WorkplaceMunicipal Sustainability & Affordable Housing711 3 St SE$1,000,000 $1,000,000   Details
Extended Core InfrastructureMunicipal Sustainability & Affordable Housing711 3 St SE  $5,400,000 2009 Details
Infrastructure Management SystemsMunicipal Sustainability & Affordable Housing800 MacLeod Tr S  $9,000,000 2009 Details
Web-Based InitiativesMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$8,712,000 $16,556,000 2009 Details
Assessment / Tax / Complaint Phase 2Municipal Sustainability & Affordable Housing711 3 St SE  $12,600,000 2009 Details
E-GovernmentMunicipal Sustainability & Affordable Housing800 MacLeod Tr S  $8,000,000 Fall 2009 Details
Business Assessment And Tax SystemMunicipal Sustainability & Affordable Housing711 3 St SE$530,000 $530,000 Fall 2009 Details
IT Fibre OpticsMunicipal Sustainability & Affordable Housing711 3 St SE  $2,400,000 2009 Details
IT Development PoolMunicipal Sustainability & Affordable Housing711 3 St SE  $21,560,000 2009 Details
Application RenewalMunicipal Sustainability & Affordable Housing711 3 St SE$10,000,000 $1,500,000 2009 Details
Tri-Services Cad SystemMunicipal Sustainability & Affordable Housing711 3 St SE  $465,000 2009 Details
Energy Management StudiesMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$280,000 $280,000 2011 Details
Capital Planning SoftwareMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$3,860,000 $3,860,000 Fall 2009 Details
Sustainable Building Partnership ProgramMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$11,700,000 $11,700,000 Fall 2009 Details
Energy Management ProgramMunicipal Sustainability & Affordable Housing10301 Southport Lane SW$8,200,000 $8,200,000 Fall 2009 Details
CORE Mapping Project - Improved GIS Base Mapping Capabilities Municipal Sustainability & Affordable Housing800 MacLeod Tr S$8,700,000 $6,700,000 Spring 2009 Details
Geospatial Emergency Management (GEM)Municipal Sustainability & Affordable Housing800 MacLeod Tr S$2,300,000 $2,370,000 Spring 2010 Details
Buildings RepositoryMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$3,000,000 $3,015,000 Spring 2010 Details
Survey EquipmentMunicipal Sustainability & Affordable HousingCity Manchester Yards$710,000 $710,000 Winter 2009 Details
Business EquipmentMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$520,000 $520,000 Summer 2009 Details
Survey Control MarkerMunicipal Sustainability & Affordable HousingCity Manchester Yards$663,000 $663,000   Details
GPS Real-Time Kinematic (RTK) NetworkMunicipal Sustainability & Affordable HousingCity Manchester Yards$903,000 $903,000 Winter 2010 Details
Storage Management System For Aerial ImageryMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$255,000 $255,000 Spring 2010 Details
City Online Application UpgradeMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$1,950,000 $1,950,000 Winter 2009 Details
Bridges Site 15 - Affordable HousingMunicipal Sustainability & Affordable Housing925 McPherson Rd NE      Details
Increase Affordable Housing SupplyMunicipal Sustainability & Affordable Housing800 MacLeod Tr S    Ongoing Details
Manchester Affordable Housing Project (North)Municipal Sustainability & Affordable Housing307 55 Av SW    September 2009 Details and Photos
CrestwoodMunicipal Sustainability & Affordable Housing2425 69 Av SE      Details and Photos
Financial Incentives Pilot ProgramMunicipal Sustainability & Affordable Housing800 MacLeod Tr S    October 2009 Details
Louise Station (Affordable Housing and Retail Development Project)Municipal Sustainability & Affordable Housing872 4th Av SW    Fall 2007 Details and Photos
VidaMunicipal Sustainability & Affordable Housing333 17 Av NW    2010 Details and Photos
Vista Grande Housing (part of Proj 489-LSH)Municipal Sustainability & Affordable Housing2222 Vermillion St NE      Details and Photos
Aurora Business ParkMunicipal Sustainability & Affordable HousingNorth East Calgary (West of Deerfoot Trail / South of 96 Avenue)      Details and Photos
Bow Valley Centre Development (The Bridges)Municipal Sustainability & Affordable HousingBridgeland    2000 Details
Royal Vista (Spyhill Business Park)Municipal Sustainability & Affordable HousingRoyal Vista    Spring 2009 Details and Photos
Lincoln Park (ATCO) / Westmount Business Park (696-CFB)Municipal Sustainability & Affordable HousingLincoln Park    Spring 2012 Details
Dufferin Industrial ParkMunicipal Sustainability & Affordable HousingEast Shepard Industrial      Details
Forest Lawn Creek Industrial ParkMunicipal Sustainability & Affordable HousingStarfield      Details and Photos
Great Plains IV Industrial ParkMunicipal Sustainability & Affordable HousingGreat Plains    Summer 2008 Details and Photos
Shepard Industrial ParkMunicipal Sustainability & Affordable HousingEast of Great Plains    2012 Details and Photos
Eastlake Industrial ParkMunicipal Sustainability & Affordable HousingEast Shepard Industrial    2003 Details and Photos
Anderson Transit Oriented DevelopmentMunicipal Sustainability & Affordable HousingAnderson Station      Details and Photos
RailtownMunicipal Sustainability & Affordable HousingSE Calgary    N/A Details
Block 40 Redevelopment ProgramMunicipal Sustainability & Affordable Housing700 MacLeod Tr S    2008 Details and Photos
Capital Asset AcquisitionMunicipal Sustainability & Affordable Housing800 MacLeod Tr S$9,412,000 $8,822,000 Spring 2009 Details
Cash System IntegrationMunicipal Sustainability & Affordable Housing800 MacLeod Tr S  $1,180,000   Details
Working Space InitiativeMunicipal Sustainability & Affordable Housing800 MacLeod Tr S  $1,200,000   Details
Land Use Bylaw Implementation & SustainmentMunicipal Sustainability & Affordable Housing800 MacLeod Tr S  $2,808,000   Details
Downtown ImprovementsMunicipal Sustainability & Affordable HousingDowntown Commercial Core$1,105,000 $1,105,000   Details
S.E. Bus Rapid Transit ServiceMobilitySE Calgary$25,000,000 $30,111,000 Summer 2009 Details
Advanced Passenger Information System: Next C-Train / BusMobility928 32 Av NE$10,000,000 $22,527,000 2009 Details
LRT Platform ReconstructionMobility300 7 Av SW$13,300,000 $149,705,000 Spring 2009 Details and Photos
LRT Platform ReconstructionMobility400 7 Av SW$11,400,000 $149,705,000 Early 2010 Details and Photos
LRT Platform ReconstructionMobility600 7 Av SW$13,100,000 $149,705,000 Spring 2008 Details and Photos
LRT Platform ReconstructionMobility700 7 Av SW$11,700,000 $149,705,000 Early 2008 Details and Photos
LRT Platform ReconstructionMobility800 7 Av SW$11,300,000 $149,705,000 Spring 2009 Details and Photos
LRT Platform ReconstructionMobilityMacleod Trail /7th Avenue$25,000,000 $149,705,000 Early 2010 Details
Four Car Platforms-201 North And South LRT Stations (TIIP)MobilityC-Train stations on the NW and S legs$8,000,000 $80,000,000 2010 Details
LRT Station Refurbishment (New Fed Grant) (TIIP)MobilityC-Train stations on the NE leg.  $28,000,000 2010 Details
LRT Closed Circuit Television (CCTV) System ReplacementMobility928 32 Av NE  $6,000,000 2010 Details
Light Rail Vehicles (LRV) for LRTMobility928 32 Av NE$134,000,000 $141,739,000 2010 Details
Big Buses / Community Shuttle Buses (TIIP)Mobility928 32 Av NE$109,829,000 $109,829,000 2010 Details
Fare Collection Equipment & SystemMobility928 32 Av NE$6,000,000 $12,871,000 2011 Details
New Traffic Signals and Pedestrian CorridorsMobility22 Av / 4 St SW  $10,806,000 Spring 2009 Details
New Traffic Signals and Pedestrian CorridorsMobility17 Av / 12 St SW  $10,806,000 Spring 2009 Details
New Traffic Signals and Pedestrian CorridorsMobility162 Av / 24 St SW  $10,806,000 Spring 2009 Details
New Traffic Signals and Pedestrian CorridorsMobilityBow Tr / 85 St SW  $10,806,000 Summer 2009 Details
New Traffic Signals and Pedestrian CorridorsMobilityWentworth Dr / 85 St SW  $10,806,000 Summer 2009 Details
New Traffic Signals and Pedestrian CorridorsMobility3 Av / 10 St NW  $10,806,000 Summer 2009 Details
New Traffic Signals and Pedestrian CorridorsMobility42 Av / Highfield Blvd & 12 St SE  $10,806,000 Summer 2009 Details
New Traffic Signals and Pedestrian CorridorsMobility53 Av / Macleod Tr S  $10,806,000 Spring 2009 Details
New Traffic Signals and Pedestrian CorridorsMobility4 Av / 11 St SW  $10,806,000 Spring 2009 Details
New Traffic Signals and Pedestrian CorridorsMobility64th Avenue NE/Martingrove Drive NE  $6,274,000   Details
New Traffic Signals and Pedestrian CorridorsMobility106th Avenue/Dufferin Place (52nd Street SE)  $6,274,000   Details
New Traffic Signals and Pedestrian CorridorsMobility22nd Avenue/4th Street SW  $6,274,000   Details
New Traffic Signals and Pedestrian CorridorsMobility2nd Avenue/ 4th Street SW  $6,274,000   Details
New Traffic Signals and Pedestrian CorridorsMobility40th Avenue/LRT Parking Lot (36th St) NW  $6,274,000 Summer 2010 Details
New Traffic Signals and Pedestrian CorridorsMobility42nd Street/Highfield Blvd -12th Street SE  $6,274,000 Summer 2010 Details
Bridge Rehabilitation And ProtectionMobilityEastbound Bow Trail over CPR tracks  $30,444,000 Spring 2009 Details
Resurfacing of Hwy 22xMobilityHwy 22X SE$6,000,000 $5,552,000 Summer 2009 Details
Noise Attenuation RetrofitMobilityJohn Laurie Blvd between Brisbois Dr and Brenner Dr  $7,053,000 Fall 2007 Details
Noise Attenuation RetrofitMobilityCountry Hills Blvd between Sarcee Tr to Citadel Link  $7,053,000 Winter 2008 Details
Noise Attenuation RetrofitMobilityCountry Hills Blvd: west of Hampstead Rd to hamptons Blvd (W leg) N.W.  $7,053,000 2008 Details
Noise Attenuation RetrofitMobilityCanyon Meadows Blvd between Canterbury Dr to Cantrell Pl  $7,053,000 spring 2009 Details
Noise Attenuation RetrofitMobilityMacleod Trail at Lake Fraser Gate (west side)  $7,053,000 Fall 2008 Details
Noise Attenuation RetrofitMobility90 Avenue SW between 16 St to Bay Ridge Dr  $7,053,000 Fall 2010 Details
Noise Attenuation RetrofitMobilityCrowchild Tr NW: South of 16th Avenue to 14th Avenue NW  $7,053,000 Fall 2010 Details
Noise Attenuation RetrofitMobilityCountry Hills Blvd between Panorama Hills Blvd to Panorama Hills Green  $7,053,000 Fall 2010 Details
Noise Attenuation RetrofitMobilityStrathcona Blvd SW, East and West side from Bow Trail to Strathcona Drive SW  $7,053,000 2009 Details
Pedestrian OverpassMobilityWhitehorn / Westwinds$4,200,000 $36,132,000 Fall 2008 Details
Pedestrian OverpassMobilityArbour Lake / Royal Oak$4,600,000 $36,132,000 Fall 2008 Details
Pedestrian OverpassMobilityHidden Valley$5,800,000 $36,132,000 Summer 2008 Details
Pedestrian OverpassMobilityWestwinds over Metis Trail$5,200,000 $36,132,000 Fall 2009 Details
Downtown Pedestrian Bridge over Bow River: Peace BridgeMobilityJust west of Princess Island near 8 Street W.$24,353,000 $25,000,000 Winter 2009 Details
Reversible Lane Control SystemMobilitySunalta$2,000,000 $5,823,000 Summer 2009 Details
Reversible Lane Control SystemMobilitySunnyside$2,000,000 $5,823,000 Summer 2009 Details
Glenmore Trail / 37 Street SWMobilityGlenmore Trail / 37 Street SW  $23,251,000 Spring 2010 Details
Glenmore Tr Widening between 52 St to 84 St EastMobilityGlenmore Trail, 52 St SE to 84 St SE$44,000 $12,000 Fall 2006 Details
Glenmore Trail Widening betweenOgden Rd - Bow River BridgeMobilityGlenmore Trail SE between 18 Street and Deerfoot Trail$25,072,000 $11,812,000 December 2007 Details
52 St E Widening between Glenmore Tr. To 130 Ave S.Mobility52nd St SE between Glenmore Tr. and 130 Ave SE$89,131,000 $89,131,000 Spring 2008 Details
16 Avenue N Road WideningMobility16 Ave N$81,700,000 $15,203,000 2005 Details and Photos
Provincial Ring Road Connector Projects: 16 Avenue and 68 Street Intersection ImprovementsMobilityFrom 52 Street to 68 Street SE$19,500,000 $53,604,000 Summer 2009 Details
N.W. LRT Extension to CrowfootMobilityNW Calgary$210,300,000 $21,880,000 2006 Details
96 Ave N. between Deerfoot Tr to Harvest Hills Lk.MobilityBetween Harvest Gold Mr. NE and east of Harvest Hill Link NE (on 96 Avenue NE)  $50,260,000 Summer 2009 Details
Beddington Tr / Country Hills Blvd InterchangeMobilityBeddington Trail / Country Hills Blvd$29,089,000 $22,308,000 Winter 2008 Details
4 St SE UnderpassMobility4th St SE, between 9th Av and 10th Av (under the CPR tracks), to connect the East Village with Victoria Park and the Stampede Grounds.$28,000,000 $28,000,000 2010 Details
Metis Trail: Airport Trail to NE Stoney TrailMobilityMetis Tr; from Stoney Trail to Airport Tr NE$48,950,000 $48,950,000 Spring 2008 Details
Extension of LRT service from Crowfoot Station to Rocky Ridge/TuscanyMobilityNW Calgary$92,000,000 $112,410,000 Winter 2009 Details
NE LRT Extension to SaddleridgeMobilityMcKnight/Westwinds to Saddletown Station$83,651,000 $121,329,000 Summer 2009 Details
Major Road ReconstructionMobilityVarious locations throughout Calgary including Edmonton Trail, Elbow Drive, Centre Street$27,056,000 $16,356,000   Details
West LRTMobilitySW Calgary  $853,611,000 Early 2010 Details
Data ManagementEnvironmental Sustainability800 Macleod TR SE$700,000 $1,424,000 Spring 2008 Details
Former Imperial Oil Refinery Site RemediationEnvironmental Sustainability5305 Ogden Rd SE$1,489,000 $1,473,000 Winter 2009 Details
Landfill Cells at East Calgary LandfillEnvironmental SustainabilitySE Calgary$2,000,000 $31,682,000 Spring 2009 Details
Landfill Cells at Shepard LandfillEnvironmental SustainabilitySE Calgary$2,000,000 $31,682,000 Summer 2010 Details
Landfill Cells at Spyhill LandfillEnvironmental SustainabilityNW Calgary$2,000,000 $31,682,000 Spring 2011 Details
Shepard Scale EntranceEnvironmental SustainabilitySE Calgary$8,781,000 $6,612,000 Spring 2008 Details
Access Road to Race City SpeedwayEnvironmental SustainabilitySE Calgary$500,000 $6,612,000 Summer 2010 Details
Completion of Stormwater Management Facilities at East Calgary LandfillEnvironmental SustainabilitySE Calgary$8,295,000 $5,890,000 Summer 2010 Details and Photos
Landfill Gas Collection System Extension at Shepard landfillEnvironmental SustainabilitySE Calgary  $7,003,000 Spring 2012 Details
Landfill Gas Collection System Extension at East Calgary land fillEnvironmental SustainabilitySE Calgary  $7,003,000 Spring 2012 Details and Photos
Landfill Gas Collection System at Spyhill LandfillEnvironmental SustainabilityNW Calgary  $7,003,000 Spring 2012 Details
Spyhill Landfill UpgradesEnvironmental SustainabilityNW Calgary$12,391,000 $11,732,000 Spring 2011 Details
East Calgary Landfill UpgradesEnvironmental SustainabilitySE Calgary$12,509,000 $11,732,000 Spring 2012 Details
Integrated Collection System SoftwareEnvironmental SustainabilitySE Calgary$2,970,000 $5,011,000 Summer 2008 Details
Truck Shelter & Office at Shepard LandfillEnvironmental SustainabilitySE Calgary$10,000,000 $27,828,000 Summer 2009 Details and Photos
Capital Maintenance for Glenmore Water Treatment PlantEnvironmental SustainabilityNorth Glenmore$6,166,000 $77,918,000 ongoing Details
Glenmore Dam MaintenanceEnvironmental SustainabilityNorth Glenmore$7,483,000 $77,918,000 Winter 2007 Details
Capital Maintenance for Bearspaw Water Treatment PlantEnvironmental Sustainability1634 56 Av SW$18,246,000 $77,918,000 ongoing Details
Glenmore Water Treatment Plant UpgradeEnvironmental Sustainability1634 56 Av SW$218,722,000 $126,163,000 Spring 2004 Details
Capital Maintenance for PumpstationsEnvironmental SustainabilityNorth Glenmore$4,177,000 $172,879,000 ongoing Details
Valley Ridge FeedermainEnvironmental SustainabilityBowness / Valleyridge$18,165,000 $172,879,000 Winter 2007 Details
60 St NE FeedermainEnvironmental SustainabilitySaddleridge$15,342,000 $172,879,000   Details
Big Hill East ReservoirEnvironmental SustainabilitySee File previously sent$13,715,000 $172,879,000 Aug-10 Details
Rehab / Renew Currie ReservoirEnvironmental Sustainability3513 Crowchild Trail SW$17,419,000 $172,879,000 Ongoing Details
Cranston - Bow River Feedermain CrossingEnvironmental SustainabilityCranston$12,600,000 $172,879,000 Fall 2008 Details
MacLeod Trail FeedermainEnvironmental Sustainability $20,739,000 $172,879,000 Summer 2009 Details
Old Banff Coach Road Feedermain - Phase 2 & 3Environmental Sustainability $2,899,000 $172,879,000 Summer 2009 Details
Shaganappi Feedermain Phase 2Environmental Sustainability $6,700,000 $172,879,000 Spring 2010 Details
Capital Maintenance for Bonnybrook Wastewater Treatment PlantEnvironmental SustainabilityBonnybrook WWTP$15,955,000 $144,286,000 ongoing Details
Capital Maintenance for Fish Creek Wastewater Treatment PlantEnvironmental Sustainability $5,321,000 $144,286,000 ongoing Details
Effluent Filtration at Bonnybrook Wastewater Treatment PlantEnvironmental SustainabilityBonnybrook WWTP$50,409,000 $144,286,000 Fall 2010 Details
Volitile Fatty AcidEnvironmental SustainabilityBBWWTP$27,111,000 $144,286,000 Spring 2009 Details
Twinning Bonnybrook Wastewater Treatment Plant Sludge LineEnvironmental SustainabilitySE Calgary$16,098,000 $144,286,000 Spring 2009 Details
Digester Gas UtilizationEnvironmental SustainabilityBonnybrook WWTP$14,000,000 $144,286,000 Jul-10 Details
Pine Creek Treatment PlantEnvironmental Sustainability3131 210 Av SE$489,161,000 $90,774,000 Summer 2004 Details
Beddington Creek South Wastewater Network UpgradeEnvironmental SustainabilityBeddington$8,527,000 $201,063,000 Spring 2009 Details
Confederation Wastewater Network UpgradeEnvironmental SustainabilityGreenview Industrial Park$8,776,000 $201,063,000 Spring 2009 Details
Nose Creek Wastewater NetworkEnvironmental Sustainability $58,495,000 $201,063,000 Summer 2010 Details
Silverado - West Pine Creek Wastewater NetworkEnvironmental SustainabilitySee Map$18,806,000 $201,063,000 Dec-10 Details
South Cranston SiphonEnvironmental SustainabilityCranston$13,226,000 $201,063,000 Fall 2008 Details
Saddleridge Relief Sanitary SewerEnvironmental SustainabilitySaddleridge$6,000,000 $201,063,000 Trunk 2 - Fall 2010 Details
Bonnybrook Wastewater Network LineEnvironmental SustainabilityInglewood$32,963,000 $18,937,000 Winter 2005 Details
Metis Trail / Northridge MacDonald Storm NetworkEnvironmental SustainabilitySee Map$15,200,000 $26,721,000   Details
MahoganyEnvironmental SustainabilityMahogany$5,600,000 $42,466,000 Summer 2010 Details
Pineridge Dry PondEnvironmental SustainabilityPineridge$10,437,000 $42,466,000 Spring 2008 Details
Lakeview Storm System ImprovementEnvironmental SustainabilityLakeview$17,362,000 $42,466,000 Spring 2010 Details
Shepard Wetlands- Great Plains StormEnvironmental SustainabilityGreat Plains / Shepard$5,083,000 $24,531,000   Details
Shepard Wetland Projects- Stormwater Diversion ProjectEnvironmental SustainabilityShepard$69,030,000 $24,531,000   Details
Shepard Wetlands - 130 Avenue S.E. Storm TrunkEnvironmental SustainabilityShepard$9,200,000 $24,531,000   Details
Major Stormwater Quality Improvements: Fish Creek EastEnvironmental SustainabilitySE Calgary$2,900,000 $67,642,000   Details
Major Stormwater Quality Improvements: Votier's FlatsEnvironmental SustainabilitySW Calgary$3,400,000 $67,642,000   Details
Major Stormwater Quality Improvements: Marshall SpringsEnvironmental SustainabilitySW Calgary$10,600,000 $67,642,000   Details
Major Stormwater Quality Improvements: BurnsmeadEnvironmental SustainabilitySW Calgary$5,500,000 $67,642,000   Details
Major Stormwater Quality Improvements: Heron Colony & Acadia Natural AreaEnvironmental SustainabilitySE Calgary$9,800,000 $67,642,000 Spring 2009 Details
Major Stormwater Quality Improvements: Coventry Hills North & SouthEnvironmental SustainabilityCoventry Hills$2,200,000 $67,642,000   Details
Major Stormwater Quality Improvements: Greenview & McCallEnvironmental SustainabilityGreenview Industrial Park$4,000,000 $67,642,000 Spring 2010 Details
Major Stormwater Quality Improvements: 54 Street S.E. PondEnvironmental SustainabilitySE Calgary$17,200,000 $67,642,000 Fall 2010 Details